Zuozhen District, Tainan

Case Study:Ground-Mounted SolarPower System

  • Location: Tainan Zuozhen Guanghe Section
  • Installed Capacity: 1,496 kWp
  • System Type: Ground-mounted
  • Annual Power Generation: Approx. 1,746,368 kWh
  • Annual CO₂ Reduction: 877 metric tons CO₂e


Featured Projects

Yuanchang, Yunlin County

Case Study:Yuanchang, Yunlin County RooftopLocation: Yuanchang Township, Yunlin CountyCapacity: 400 kWpInstallation Type: RooftopEstimated Annual Output: Approximately 500,000 kWhAnnual Carbon Reduction: 295 tons

Sihu, Yunlin

Case Study:Solar Energy for Carport Grounds In the existing training ground, solar panels were installed for shading, enabling classes to continue regardless of rain or intense sunlight. Location:Sihu Township, Yunlin CountyCapacity: 499kWInstallation Type: Ground-mountedEstimated Annual Power Generation: Approximately 623,000 kWhCarbon Reduction in One Year: 253 metric tons 

Gongguan , Miaoli County

 Case Study: Solar Power System Ground-Mounted TypeLocation: Gongguan Township, Miaoli CountyCapacity: 752 kWpInstallation Type: Ground-mountedEstimated Annual Output: Approximately 890,000 kWhAnnual Carbon Reduction: 450 tonsLocation: Minxiong Township, Chiayi CountyCapacity: 690kWpInstallation Type: RooftopEstimated Annual Output: Approximately 810,000 kWhAnnual Carbon Reduction: 410 tons